# Board Pack Time Calculator
Estimate the annual hours and fully loaded cost of producing your board pack. Indicative Red / Amber / Green band in under two minutes.
Rodan · Reporting cost calculator

# What does your board pack really cost?

     Score the indicative hours and fully loaded cost of each reporting cycle, plus how long period-close to pack-ready is slowing decisions. Instant band. Detail unlocks after email.

      [Calculate time cost](#calculator)
      [Dashboard consolidation audit](/tools/dashboard-audit)

     Indicative only. Inputs stay in your browser. Analytics receives the band, never your hours or rates. About 60 seconds.

     Calculator

## Your pack production inputs

     Use a typical cycle (monthly or quarterly). Fully loaded rate should include employer costs, not base salary alone.

         People involved
           1 to 40

         Hours per person per cycle
           0.5 to 80

         Cycles per year
           1 to 24 · default 12

         Fully loaded £/hour
           20 to 500 · default 85

         Manual tools count
           1 to 50 · spreadsheets, exports, BI tabs

         Days from period close to pack ready
           1 to 45

         Show indicative band **
         Reset
HTML: https://rodan.io/tools/board-pack
